FLAIR DR over EATON WASH

0.2MI W/O BALDWIN AVE · County 037, California · Built 1956 · 2 Lanes · 8,240 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53C0172
Year Built
1956
Length
18.9 m (62 ft)
Max Span
18.6 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
8,240
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.