SAN FRNDO MISON BL over EAST CANYON CHANNEL
GLDN ST FWY & SHARP AV · County 037, California · Built 1967 · 4 Lanes · 24,215 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
34.276153, -118.453947
This bridge is in worse condition than 15.3% of bridges in County 037. The average bridge in California is 0 years old; this one is 59 years old.
Nearby Bridges
ALLEY N HAGAR ST over EAST CANYON CHANNEL
Built 1971
HAGAR ST over EAST CANYON CHANNEL
Built 1967
I 5 over SAN FERNANDO MISSION BL
Built 1963
MACLAY ST over EAST CANYON CHANNEL
Built 1967
RINALDI ST over EAST CANYON CHANNEL
Built 1967
INTERSTATE 5 over RINALDI STREET
Built 1963
BRAND BLVD over E CANYON CHANNEL
Built 1967
ROUTE 5 over BRAND BLVD
Built 1963
INTERSTATE 5 over EAST CANYON CHANNEL
Built 1963
INTERSTATE 5 over CHATSWORTH DR
Built 1963
Bridge Details
- Structure #
- 53C1307
- Year Built
- 1967
- Length
- 9.8 m (32.2 ft)
- Max Span
- 4.6 m
- Width
- 25.6 m (84 ft)
- Lanes
- 4
- Daily Traffic
- 24,215
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.