INTERSTATE 5 over EAST CANYON CHANNEL

07-LA-005-40.53-LA · County 037, California · Built 1963 · 9 Lanes · 156,373 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
53 1519M
Year Built
1963
Length
11.9 m (39 ft)
Max Span
5.8 m
Width
73.5 m (241.1 ft)
Lanes
9
Daily Traffic
156,373
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.