SOLEDAD CYN RD over SANTA CLARA RIV BR
0.3MI E/O AGUA DULCE CY · County 037, California · Built 1936 · 2 Lanes · 2,550 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
34.436733, -118.333947
This bridge is in worse condition than 97.4% of bridges in County 037. The average bridge in California is 0 years old; this one is 90 years old.
Nearby Bridges
SOLEDAD CYN RD over LACMTA AND SCRRA TRACK
Built 1938
AGUA DULCE CYN RD over AGUA DULCE CR
Built 1954
SOLEDAD CYN RD over BEE CYN WASH
Built 2002
AGUA DULCE CYN RD over ESCONDIDO CYN WASH
Built 1962
STATE ROUTE 14 over AGUA DULCE RD UC
Built 1963
STATE ROUTE 14 over SPRING CANYON ROAD
Built 1963
SOLEDAD CYN RD over NELSON CYN WASH
Built 1949
SOLEDAD CYN RD over MAHER CYN CR
Built 1949
SOLEDAD CYN RD over SPRING CYN WASH
Built 1948
SOLEDAD CANYON RD over SOLEDAD CANYON RD
Built 1963
Bridge Details
- Structure #
- 53C0488
- Year Built
- 1936
- Reconstructed
- 1940
- Length
- 98.5 m (323.2 ft)
- Max Span
- 15.2 m
- Width
- 8 m (26.2 ft)
- Lanes
- 2
- Daily Traffic
- 2,550
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,812,000
- Total Project Cost
- $3,044,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.