SOLEDAD CYN RD over NELSON CYN WASH

3MI E/O AGUA DULCE CYN RD · County 037, California · Built 1949 · 2 Lanes · 2,550 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
53C0487
Year Built
1949
Reconstructed
1962
Length
18.9 m (62 ft)
Max Span
6.1 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
2,550
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.