WILLOW ST over EDISON ACCESS RD UC
0.3MI W/O I-605 FWY · County 037, California · Built 1962 · 4 Lanes · 28,620 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.803572, -118.084528
This bridge is in worse condition than 15.3% of bridges in County 037. The average bridge in California is 0 years old; this one is 64 years old.
Nearby Bridges
WILLOW ST over COYOTE CRK
Built 1962
S605-KATELLA OFF R over KATELLA AVE
Built 1966
N605-KATELLA OFF R over KATELLA AVE
Built 1966
INTERSTATE 605 over KATELLA AVE
Built 1966
INTERSTATE 605 over COYOTE CREEK
Built 1966
WILLOW ST over SAN GABRIEL RIV
Built 1962
WILLOW ST over W ACCESS RD UC
Built 1962
SPRING STREET over INTERSTATE 605
Built 1965
SPRING ST over SAN GABRIEL RIV
Built 1952
WB CERRITOS AVE over COYOTE CREEK CHANNEL
Built 1962
Bridge Details
- Structure #
- 53C0282
- Year Built
- 1962
- Length
- 13.4 m (44 ft)
- Max Span
- 12.2 m
- Width
- 22.7 m (74.5 ft)
- Lanes
- 4
- Daily Traffic
- 28,620
- Material
- Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.