SPRING ST over SAN GABRIEL RIV

0.5MI W/O I-605 FWY · County 037, California · Built 1952 · 6 Lanes · 20,140 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
53C0089
Year Built
1952
Reconstructed
1972
Length
72.4 m (237.5 ft)
Max Span
22.6 m
Width
27.7 m (90.9 ft)
Lanes
6
Daily Traffic
20,140
Material
Concrete Continuous
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.