2ND ST over MARINE STAD / APPIAN
0.3MI W/O SR-1 HWY · County 037, California · Built 1955 · 6 Lanes · 45,571 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.756894, -118.116003
This bridge is in worse condition than 97.4% of bridges in County 037. The average bridge in California is 0 years old; this one is 71 years old.
Nearby Bridges
THE TOLEDO E over RIVO ALTO CANAL
Built 1967
NEOPOLITAN LN E over RIVO ALTO CANAL
Built 1968
RAVENNA DR over RIVO ALTO CANAL
Built 1953
APPIAN WAY over ALAMITOS BAY
Built 1960
NEOPOLITAN LN W over RIVO ALTO CANAL
Built 1976
THE TOLEDO W over RIVO ALTO CANAL
Built 1967
STATE ROUTE 1 over SAN GABRIEL RIVER
Built 1931
MARINA DR over SAN GABRIEL RIV
Built 2005
2ND ST over ALAMITOS BAY CHAN
Built 1967
STUDEBAKER RD S/B over S C EDISON S CHAN
Built 1966
Bridge Details
- Structure #
- 53C0209
- Year Built
- 1955
- Length
- 243.8 m (799.9 ft)
- Max Span
- 38.1 m
- Width
- 27.6 m (90.6 ft)
- Lanes
- 6
- Daily Traffic
- 45,571
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,728,000
- Total Project Cost
- $22,418,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.