THE TOLEDO E over RIVO ALTO CANAL

0.1MI E/O RAVENNA DR · County 037, California · Built 1967 · 2 Lanes · 1,020 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
53C0022
Year Built
1967
Length
22.9 m (75.1 ft)
Max Span
20.4 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
1,020
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.