BURBANK BLVD over LAKE ST / SPTCO
300FT W/O I-5 FWY · County 037, California · Built 1958 · 6 Lanes · 50,138 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.184636, -118.320528
This bridge is in worse condition than 73.1% of bridges in County 037. The average bridge in California is 0 years old; this one is 68 years old.
Nearby Bridges
BURBANK BLVD over INTERSTATE 5
Built 2022
ROUTE 5 over STOUGH CANYON
Built 2021
ROUTE 5 over BURBANK WEST CHANNEL
Built 1960
INTERSTATE 5 over BURBANK WESTERN CHANNEL
Built 2019
MAGNOLIA BL over FRONTAGE RD / SPTCO
Built 1959
MAGNOLIA BLVD F RD over BURBANK WESTERN CHAN
Built 1949
MAGNOLIA BOULEVARD over ROUTE 5 & FRONTAGE RD
Built 1959
INTERSTATE 5 over EMPIRE AVE
Built 2022
OLIVE AVE over FRONT ST SPTCO FLOWER
Built 1959
OLIVE AVE over ROUTE 5 & OLIVE AVE
Built 1959
Bridge Details
- Structure #
- 53C0198
- Year Built
- 1958
- Reconstructed
- 2006
- Length
- 124.5 m (408.5 ft)
- Max Span
- 124.5 m
- Width
- 34.5 m (113.2 ft)
- Lanes
- 6
- Daily Traffic
- 50,138
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.