ROUTE 5 over STOUGH CANYON
07-LA-005-29.78 · County 037, California · Built 2021 · 5 Lanes · 239,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
34.186028, -118.318611
This bridge is in worse condition than 14.8% of bridges in County 037. The average bridge in California is 0 years old; this one is 5 years old.
Nearby Bridges
BURBANK BLVD over INTERSTATE 5
Built 2022
BURBANK BLVD over LAKE ST / SPTCO
Built 1958
ROUTE 5 over BURBANK WEST CHANNEL
Built 1960
INTERSTATE 5 over BURBANK WESTERN CHANNEL
Built 2019
MAGNOLIA BOULEVARD over ROUTE 5 & FRONTAGE RD
Built 1959
MAGNOLIA BL over FRONTAGE RD / SPTCO
Built 1959
MAGNOLIA BLVD F RD over BURBANK WESTERN CHAN
Built 1949
INTERSTATE 5 over EMPIRE AVE
Built 2022
OLIVE AVE over ROUTE 5 & OLIVE AVE
Built 1959
OLIVE AVE over FRONT ST SPTCO FLOWER
Built 1959
Bridge Details
- Structure #
- 53 3077M
- Year Built
- 2021
- Length
- 7 m (23 ft)
- Max Span
- 5.5 m
- Width
- 40.4 m (132.5 ft)
- Lanes
- 5
- Daily Traffic
- 239,000
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.