ROSECRANS AVE over SAN GABRIEL RIV

0.3MI W/O I-605 FWY · County 037, California · Built 1951 · 4 Lanes · 28,840 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
53C0079
Year Built
1951
Length
92.8 m (304.5 ft)
Max Span
20.4 m
Width
18 m (59.1 ft)
Lanes
4
Daily Traffic
28,840
Material
Concrete Continuous
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.