N605-W105 CONN over ROSECRANS AVE

07-LA-605-R6.81-NRW · County 037, California · Built 1993 · 3 Lanes · 26,260 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 2699G
Year Built
1993
Length
135.6 m (444.9 ft)
Max Span
48.8 m
Width
16 m (52.5 ft)
Lanes
3
Daily Traffic
26,260
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.