SB 405 OFFRAMP over SIDEHILL

07-LA-110-15.25-TOR · County 037, California · Built 2024 · 1 Lanes · 32,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
53 3102K
Year Built
2024
Length
79.2 m (259.8 ft)
Max Span
6.2 m
Width
8.4 m (27.6 ft)
Lanes
1
Daily Traffic
32,500
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.