INTERSTATE 405 over ARTESIA BLVD
07-LA-405-16.56-TOR · County 037, California · Built 1962 · 12 Lanes · 260,800 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.872767, -118.342292
This bridge is in worse condition than 73.1% of bridges in County 037. The average bridge in California is 0 years old; this one is 64 years old.
Nearby Bridges
INTERSTATE 405 over PRAIRIE AVENUE
Built 1962
INTERSTATE 405 over REDONDO BEACH BLVD
Built 1962
INTERSTATE 405 over YUKON AVENUE
Built 1962
INTERSTATE 405 over 166TH STREET
Built 1962
INTERSTATE 405 over 182ND STREET
Built 1962
REDONDO BCH BLVD over DOMINGUEZ CHAN
Built 1960
SB 405 OFFRAMP over SIDEHILL
Built 2024
INTERSTATE 405 over HAWTHORNE BLVD
Built 1962
EL CAMINO COLEGE M over REDONDO BEACH BLVD
Built 1978
CHERRY AVE over DOMINGUEZ CHAN
Built 1960
Bridge Details
- Structure #
- 53 1227
- Year Built
- 1962
- Length
- 57.3 m (188 ft)
- Max Span
- 18.3 m
- Width
- 51.1 m (167.7 ft)
- Lanes
- 12
- Daily Traffic
- 260,800
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.