INT. 10 OFF-RAMP over CAMERON AVE

07-LA-010-34.29-WCOV · County 037, California · Built 2017 · 1 Lanes · 8,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 3047S
Year Built
2017
Length
22.5 m (73.8 ft)
Max Span
21.3 m
Width
8.2 m (26.9 ft)
Lanes
1
Daily Traffic
8,000
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.