INTERSTATE 10 over CAMERON AVE

07-LA-010-34.28-WCOV · County 037, California · Built 1956 · 11 Lanes · 215,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 0667
Year Built
1956
Reconstructed
2019
Length
21.9 m (71.9 ft)
Max Span
20.7 m
Width
53.5 m (175.5 ft)
Lanes
11
Daily Traffic
215,000
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.