5-170 over I-5

07-LA-005-36.44-LA · County 037, California · Built 2015 · 2 Lanes · 62,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 2977E
Year Built
2015
Length
251 m (823.5 ft)
Max Span
42.8 m
Width
17.7 m (58.1 ft)
Lanes
2
Daily Traffic
62,600
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.