LAUREL CYN BLVD over ROUTE 5
07-LA-005-35.94-LA · County 037, California · Built 1963 · 5 Lanes · 14,983 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
34.231606, -118.403328
This bridge is in worse condition than 73.1% of bridges in County 037. The average bridge in California is 0 years old; this one is 63 years old.
Nearby Bridges
SHELDON STREET over ROUTE 5
Built 1963
LAUREL CANYON BLVD over TUJUNGA WASH
Built 1952
I-5/SR170 over I-5
Built 2015
5-170 over I-5
Built 2015
INTERSTATE 5 over TUJUNGA WASH CHANNEL
Built 1963
RAMP/CONNECTOR 5 over TUJUNGA WASH CHANNEL
Built 1963
SHARP AV-S5 ON RMP over S5-S170 CONNECTOR RAMP
Built 1963
INTERSTATE 5 SB over TUJUNGA WASH CHANNEL
Built 1963
SR 170 over ARLETA AVE & SHELDON ST
Built 1968
LAUREL CANYON BLVD over BRANFORD STREET CHANNEL
Built 1957
Bridge Details
- Structure #
- 53 1219
- Year Built
- 1963
- Length
- 94.1 m (308.7 ft)
- Max Span
- 36.7 m
- Width
- 28.7 m (94.2 ft)
- Lanes
- 5
- Daily Traffic
- 14,983
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.