605-W105 CONNECTOR over SAN GABRIEL RV/SERVICE R
07-LA-605-R7.66-NRW · County 037, California · Built 1993 · 4 Lanes · 25,450 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.915003, -118.104958
This bridge is in worse condition than 15.3% of bridges in County 037. The average bridge in California is 0 years old; this one is 33 years old.
Nearby Bridges
N605-IMPHWY OFRMP over ROUTE 105 & LRT
Built 1993
S605-W105 CONN over FIRESTONE-S605 RMP
Built 1992
INTERSTATE 605 over ROUTE 105 & LRT
Built 1993
E105-S605 CONN over S605-ROSECRANS OFFRMP
Built 1987
E105-S605 CONN over METRO NORWALK PARKING
Built 1993
HOXIE AVE over ROUTE 105 LRT
Built 1994
INTERSTATE 605 over IMPERIAL HIGHWAY
Built 1966
E105-N605 CONN over RMP CONN 105 605 IMP
Built 1993
IMPERIAL-S605 RMP over IMPERIAL HIGHWAY
Built 1993
N605-FIRESTONE BLD over IMPERIAL HWY ON-RAMP
Built 1993
Bridge Details
- Structure #
- 53 2697H
- Year Built
- 1993
- Length
- 115.7 m (379.6 ft)
- Max Span
- 45.3 m
- Width
- 20.1 m (65.9 ft)
- Lanes
- 4
- Daily Traffic
- 25,450
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.