N605-IMPHWY OFRMP over ROUTE 105 & LRT

07-LA-605-R7.61-NRW · County 037, California · Built 1993 · 2 Lanes · 8,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 2594S
Year Built
1993
Length
82 m (269 ft)
Max Span
45.3 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
8,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.