91&SB110-405 CONN over DOMINGUEZ CHAN OFF-RAMP

07-LA-110-9.15-LA · County 037, California · Built 1985 · 1 Lanes · 8,560 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
53 2558K
Year Built
1985
Length
93.9 m (308.1 ft)
Max Span
31.1 m
Width
8.4 m (27.6 ft)
Lanes
1
Daily Traffic
8,560
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.