INTERSTATE 405 over VERMONT AVE 190TH ST

07-LA-405-13.28-LA · County 037, California · Built 1962 · 10 Lanes · 269,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 1144
Year Built
1962
Reconstructed
1999
Length
138.7 m (455.1 ft)
Max Span
36.3 m
Width
43.3 m (142.1 ft)
Lanes
10
Daily Traffic
269,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,176,000
Total Project Cost
$10,375,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.