STATE ROUTE 60 over RIO HONDO

07-LA-060-8.89 · County 037, California · Built 1966 · 9 Lanes · 224,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
53 1736
Year Built
1966
Length
109.7 m (359.9 ft)
Max Span
24.4 m
Width
41.5 m (136.2 ft)
Lanes
9
Daily Traffic
224,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.