ROUTE 60 over GARFIELD AVE

07-LA-060-R5.60-MTBL · County 037, California · Built 1967 · 8 Lanes · 250,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 1695
Year Built
1967
Length
57 m (187 ft)
Max Span
31.4 m
Width
41.6 m (136.5 ft)
Lanes
8
Daily Traffic
250,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.