STATE ROUTE 60 over FINDLAY AVE

07-LA-060-R5.16-MTBL · County 037, California · Built 1967 · 10 Lanes · 250,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 1693
Year Built
1967
Reconstructed
2004
Length
38.7 m (127 ft)
Max Span
19.2 m
Width
46.1 m (151.2 ft)
Lanes
10
Daily Traffic
250,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.