PECK ROAD over ROUTE 605 & RAMP

07-LA-605-R16.65-IDY · County 037, California · Built 1963 · 2 Lanes · 20,270 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
53 1477
Year Built
1963
Length
101 m (331.4 ft)
Max Span
32.3 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
20,270
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.