STATE ROUTE 60 over SAN GABRIEL RIVER

07-LA-060-11.30-SEMT · County 037, California · Built 1967 · 11 Lanes · 228,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 1767
Year Built
1967
Length
247.1 m (810.7 ft)
Max Span
28.7 m
Width
54.3 m (178.1 ft)
Lanes
11
Daily Traffic
228,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.