1ST STREET over ARROYO SIMI
.1 MI S/O LOS ANGELES AV · County 111, California · Built 1971 · 4 Lanes · 22,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
34.270633, -118.778933
This bridge is in worse condition than 97.6% of bridges in County 111. The average bridge in California is 0 years old; this one is 55 years old.
Nearby Bridges
LOS ANGELES AVE over ARROYO SIMI
Built 1956
ROYAL AVENUE over BUS CANYON DRAIN
Built 1961
FIRST ST OC over ROUTE 118
Built 1970
SR 118 EB over CALDWELL AVE (CLOSED)
Built 1970
SR 118 WB over CALDWELL AVE (CLOSED)
Built 1970
ERRINGER ROAD over ARROYO SIMI
Built 1966
MADERA ROAD over ARROYO SIMI
Built 1979
MADERA ROAD over UP RR AMTRAK METROLINK
Built 1981
ROUTE 118 EB over MADERA RD
Built 1976
ROUTE 118 WB over MADERA RD
Built 1976
Bridge Details
- Structure #
- 52C0148
- Year Built
- 1971
- Length
- 48.5 m (159.1 ft)
- Max Span
- 23.8 m
- Width
- 29.3 m (96.1 ft)
- Lanes
- 4
- Daily Traffic
- 22,500
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,418,000
- Total Project Cost
- $2,382,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.