ROUTE 118 EB over MADERA RD
07-VEN-118-R22.99-SIMV · County 111, California · Built 1976 · 3 Lanes · 49,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.283792, -118.792797
This bridge is in worse condition than 25% of bridges in County 111. The average bridge in California is 0 years old; this one is 50 years old.
Nearby Bridges
ROUTE 118 WB over MADERA RD
Built 1976
MADERA ROAD over UP RR AMTRAK METROLINK
Built 1981
LANDFILL ACCESS RD over ROUTE 118
Built 1974
MADERA ROAD over ARROYO SIMI
Built 1979
FIRST ST OC over ROUTE 118
Built 1970
TIERRA REJADA RD over SYCAMORE CANYON CHANNEL
Built 1967
LOS ANGELES AVE over ARROYO SIMI
Built 1956
STATE ROUTE 118 over ALAMOS CANYON RD
Built 1976
STATE ROUTE 118 over ALAMOS CANYON RD
Built 1976
SR 118 WB over CALDWELL AVE (CLOSED)
Built 1970
Bridge Details
- Structure #
- 52 0354R
- Year Built
- 1976
- Reconstructed
- 1991
- Length
- 50.5 m (165.7 ft)
- Max Span
- 26.1 m
- Width
- 21.3 m (69.9 ft)
- Lanes
- 3
- Daily Traffic
- 49,000
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.