HARBOR BLVD over ARUNDELL BARRANCA

1.0 MI S SEAWARD AVE · County 111, California · Built 1959 · 2 Lanes · 9,342 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
52C0018R
Year Built
1959
Length
18.9 m (62 ft)
Max Span
7.3 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
9,342
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.