HARBOR BLVD over ARUNDELL BARRANCA

1.0 MI S SEAWARD AVE · County 111, California · Built 1965 · 2 Lanes · 8,074 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
52C0018L
Year Built
1965
Length
10.7 m (35.1 ft)
Max Span
9.4 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
8,074
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.