FOOTHILL BLVD over CUYAMA RIVER

05/SB/FOOTHILL RD · County 083, California · Built 2023 · 2 Lanes · 80 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

34.897711, -119.53425

This bridge is in worse condition than 13.5% of bridges in County 083. The average bridge in California is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
51C0381
Year Built
2023
Length
435.9 m (1430.1 ft)
Max Span
13.4 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
80
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.