STATE ROUTE 166 over BRANCH CANYON
05-SB-166-64.19 · County 083, California · Built 1943 · 2 Lanes · 4,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 4 | Poor |
Location
34.949578, -119.693467
This bridge is in worse condition than 96.2% of bridges in County 083. The average bridge in California is 0 years old; this one is 83 years old.
Bridge Details
- Structure #
- 51 0036
- Year Built
- 1943
- Reconstructed
- 2008
- Length
- 17.1 m (56.1 ft)
- Max Span
- 5.8 m
- Width
- 12.9 m (42.3 ft)
- Lanes
- 2
- Daily Traffic
- 4,500
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $506,000
- Total Project Cost
- $850,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.