CABRILLO BLVD over MISSION CREEK

NE OF STATE STREET · County 083, California · Built 2017 · 5 Lanes · 10,182 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
51C0350
Year Built
2017
Length
39.9 m (130.9 ft)
Max Span
18.9 m
Width
33.5 m (109.9 ft)
Lanes
5
Daily Traffic
10,182
Material
Prestressed Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.