NOGAL DRIVE over CIENEGUITAS CREEK

0.25 MI S HOLLISTER AVE · County 083, California · Built 1993 · 2 Lanes · 2,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
51C0216
Year Built
1993
Length
10.1 m (33.1 ft)
Max Span
9.3 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
2,500
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.