US HIGHWAY 101 NB over MARIA YGNACIO CREEK

05-SB-101-20.95 · County 083, California · Built 1961 · 3 Lanes · 60,500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
51 0162R
Year Built
1961
Reconstructed
1989
Length
44.2 m (145 ft)
Max Span
14.9 m
Width
16.7 m (54.8 ft)
Lanes
3
Daily Traffic
60,500
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$738,000
Total Project Cost
$1,239,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.