US HIGHWAY 101 over ARROYO PAREDON CREEK

05-SB-101-R5.63 · County 083, California · Built 2023 · 4 Lanes · 74,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
51 0364
Year Built
2023
Length
26.7 m (87.6 ft)
Max Span
25.3 m
Width
36.7 m (120.4 ft)
Lanes
4
Daily Traffic
74,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.