STATE ROUTE 192 over TORO CANYON CREEK

05-SB-192-12.49 · County 083, California · Built 2019 · 2 Lanes · 2,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
51 0359
Year Built
2019
Length
17.7 m (58.1 ft)
Max Span
17.1 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
2,000
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.