WILDWOOD ROAD over POSO CREEK

2.4 MI S OF POND ROAD · County 029, California · Built 1966 · 2 Lanes · 640 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
50C0271
Year Built
1966
Length
28.2 m (92.5 ft)
Max Span
9.1 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
640
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$350,000
Total Project Cost
$588,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.