STATE ROUTE 43 over POSO CREEK

06-KER-043-29.52 · County 029, California · Built 1959 · 2 Lanes · 3,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
50 0216
Year Built
1959
Length
43.6 m (143 ft)
Max Span
8.5 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
3,200
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.