ELMO HWY over STATE ROUTE 99

06-KER-099-50.41 · County 029, California · Built 1963 · 2 Lanes · 2,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
50 0233
Year Built
1963
Length
115.8 m (379.9 ft)
Max Span
25 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
2,500
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.