GAGE ST over EAST SIDE CANAL

0.1 MI S MONTEREY ST · County 029, California · Built 1959 · 2 Lanes · 3,300 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
50C0236
Year Built
1959
Length
6.3 m (20.7 ft)
Max Span
3 m
Width
19.1 m (62.7 ft)
Lanes
2
Daily Traffic
3,300
Material
Concrete Continuous
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.