BEALE AVE over UP RR SUMNER ST KENTUCKY
SOUTH MONTEREY ST · County 029, California · Built 1960 · 4 Lanes · 14,615 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.376161, -118.989797
This bridge is in worse condition than 94.8% of bridges in County 029. The average bridge in California is 0 years old; this one is 66 years old.
Nearby Bridges
BEALE AVENUE over EAST SIDE CANAL
Built 1966
OWENS ST over EAST SIDE CANAL
Built 1988
GAGE ST over EAST SIDE CANAL
Built 1959
KING BAKER KERN ST over EAST SIDE CANAL
Built 1940
ROBINSON ST over EAST SIDE CANAL
Built 1962
MILLER ST over EAST SIDE CANAL
Built 1960
TULARE ST over EAST SIDE CANAL
Built 1950
HALEY ST over EAST SIDE CANAL
Built 1957
INYO ST over EAST SIDE CANAL
Built 1989
BROWN STREET over EAST SIDE CANAL
Built 1995
Bridge Details
- Structure #
- 50C0173
- Year Built
- 1960
- Length
- 287.4 m (942.9 ft)
- Max Span
- 44.2 m
- Width
- 19.2 m (63 ft)
- Lanes
- 4
- Daily Traffic
- 14,615
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,166,000
- Total Project Cost
- $8,678,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.