TOWER LINE ROAD over SR 58
06-KER-058-R65.68 · County 029, California · Built 1970 · 2 Lanes · 16,500 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
35.329858, -118.807489
This bridge is in worse condition than 72.3% of bridges in County 029. The average bridge in California is 0 years old; this one is 56 years old.
Nearby Bridges
TEJON HWY over SR 58
Built 1970
STATE ROUTE 58 EB over CALIENTE CREEK
Built 1998
STATE ROUTE 58 WB over CALIENTE CREEK
Built 1998
COMANCHE DRIVE over SR 58
Built 1970
STATE ROUTE 58 over CALIENTE CREEK OVERFLOW
Built 1960
STATE ROUTE 58 over CALIENTE CREEK OVERFLOW
Built 1960
BENA ROAD over WALKER BASIN CREEK
Built 2013
MALAGA ROAD over SR 58
Built 1970
MALAGA RD over ARVIN-EDISON CANAL
Built 1965
HERMOSA RD over ARVIN-EDISON CANAL
Built 1965
Bridge Details
- Structure #
- 50 0365
- Year Built
- 1970
- Length
- 66.4 m (217.8 ft)
- Max Span
- 32.9 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 16,500
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.