COMANCHE DRIVE over SR 58
06-KER-058-R63.58 · County 029, California · Built 1970 · 2 Lanes · 4,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.33845, -118.843189
This bridge is in worse condition than 62.1% of bridges in County 029. The average bridge in California is 0 years old; this one is 56 years old.
Nearby Bridges
MALAGA ROAD over SR 58
Built 1970
TEJON HWY over SR 58
Built 1970
EDISON ROAD over SR 58
Built 1970
MULLER RD over ARVIN-EDISON CANAL
Built 1965
TOWER LINE ROAD over SR 58
Built 1970
HERMOSA RD over ARVIN-EDISON CANAL
Built 1965
MALAGA RD over ARVIN-EDISON CANAL
Built 1965
PANAMA LANE over ARVIN-EDISON CANAL
Built 1965
VINELAND ROAD over SR 58
Built 1970
STATE ROUTE 58 EB over CALIENTE CREEK
Built 1998
Bridge Details
- Structure #
- 50 0363
- Year Built
- 1970
- Length
- 68.3 m (224.1 ft)
- Max Span
- 34.1 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 4,000
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.