TALLY FARMS ROAD over ARROYO GRANDE CREEK
6.9 MI N OF SR 101 · County 079, California · Built 1964 · 2 Lanes · 100 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
35.185281, -120.499697
This bridge is in worse condition than 73.9% of bridges in County 079. The average bridge in California is 0 years old; this one is 62 years old.
Nearby Bridges
LOPEZ DR over LOPEZ LAKE SPILLWAY
Built 1968
LOPEZ DR over LOPEZ LAKE
Built 1968
HI MOUNTAIN RD over ARROYO GRANDE CREEK
Built 1965
HUASNA RD over ARROYO GRANDE CREEK
Built 1923
BRANCH MILL ROAD over TAR SPRING CREEK
Built 2015
CORBETT CANYON RD over QUIEN SABE CREEK
Built 1938
HI MOUNTAIN RD over SAUCELITO CREEK
Built 1966
MORRETTI CANYON RD over PIEDRA VILLA CREEK
Built 2015
STATE ROUTE 227 over EAST FORK PISMO CREEK
Built 1966
STATE ROUTE 227 over CORBETT CANYON CREEK
Built 1914
Bridge Details
- Structure #
- 49C0119
- Year Built
- 1964
- Length
- 41.5 m (136.2 ft)
- Max Span
- 5.8 m
- Width
- 7.5 m (24.6 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.