HUASNA RD over ARROYO GRANDE CREEK
0.04 MI SE LOPEZ DR · County 079, California · Built 1923 · 2 Lanes · 966 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 4 | Poor |
Location
35.139247, -120.546919
This bridge is in worse condition than 94.8% of bridges in County 079. The average bridge in California is 0 years old; this one is 103 years old.
Nearby Bridges
BRANCH MILL ROAD over TAR SPRING CREEK
Built 2015
STATE ROUTE 227 over CORBETT CANYON CREEK
Built 1914
MASON ST over ARROYO GRANDE CREEK
Built 1926
BRIDGE STREET over ARROYO GRANDE CREEK
Built 2021
US HIGHWAY 101 NB over BRIDGE ST-S101 ON RAMP
Built 1959
TRAFFIC WAY over ARROYO GRANDE CREEK
Built 1932
FAIR OAKS AVE over US HIGHWAY 101
Built 1959
US HIGHWAY 101 SB over ARROYO GRANDE CREEK
Built 1959
US HIGHWAY 101 NB over ARROYO GRANDE CREEK
Built 1959
GRAND AVE over US HWY 101 (@PM 13.17)
Built 1959
Bridge Details
- Structure #
- 49C0124
- Year Built
- 1923
- Length
- 13.7 m (44.9 ft)
- Max Span
- 12.8 m
- Width
- 6.5 m (21.3 ft)
- Lanes
- 2
- Daily Traffic
- 966
- Material
- Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $207,000
- Total Project Cost
- $347,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.