STATE ROUTE 1 over TORO CREEK
05-SLO-001-32.61 · County 079, California · Built 2023 · 2 Lanes · 7,300 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
35.412378, -120.872725
This bridge is in worse condition than 10.4% of bridges in County 079. The average bridge in California is 0 years old; this one is 3 years old.
Nearby Bridges
STATE ROUTE 1 SB over TORO CREEK
Built 1962
TORO CREEK RD over TORO CREEK
Built 1951
BEACHCOMBER DR over BEACH CREEK
Built 1925
TORO CREEK ROAD over TORO CREEK
Built 1998
OCEAN BLVD over WILLOW CREEK
Built 1925
STATE ROUTE 1 SB over OLD CREEK
Built 1961
STATE ROUTE 1 over OLD CREEK
Built 2023
STATE ROUTE 1 over OLD CREEK ROAD
Built 1965
NEGRANTI RD over TORO CREEK
Built 1965
STATE ROUTE 1 over SR 41 (@PM 0.01)
Built 1962
Bridge Details
- Structure #
- 49 0275R
- Year Built
- 2023
- Length
- 40.6 m (133.2 ft)
- Max Span
- 13.3 m
- Width
- 13.4 m (44 ft)
- Lanes
- 2
- Daily Traffic
- 7,300
- Material
- Prestressed Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.