STATE ROUTE 1 SB over TORO CREEK
05-SLO-001-32.61 · County 079, California · Built 1962 · 2 Lanes · 6,250 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
35.4126, -120.872889
This bridge is in worse condition than 94.8% of bridges in County 079. The average bridge in California is 0 years old; this one is 64 years old.
Nearby Bridges
STATE ROUTE 1 over TORO CREEK
Built 2023
TORO CREEK RD over TORO CREEK
Built 1951
BEACHCOMBER DR over BEACH CREEK
Built 1925
TORO CREEK ROAD over TORO CREEK
Built 1998
OCEAN BLVD over WILLOW CREEK
Built 1925
STATE ROUTE 1 SB over OLD CREEK
Built 1961
STATE ROUTE 1 over OLD CREEK
Built 2023
STATE ROUTE 1 over OLD CREEK ROAD
Built 1965
NEGRANTI RD over TORO CREEK
Built 1965
STATE ROUTE 1 over SR 41 (@PM 0.01)
Built 1962
Bridge Details
- Structure #
- 49 0068L
- Year Built
- 1962
- Length
- 35.6 m (116.8 ft)
- Max Span
- 8.7 m
- Width
- 12.1 m (39.7 ft)
- Lanes
- 2
- Daily Traffic
- 6,250
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $431,000
- Total Project Cost
- $724,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.